List of Experiences (Partial from 1998 ~ 2001)
 

Year 
Owner
Industry
Description of Contract
Job Volume
2001 MHI-Turkey Power Plant, Building No. 10 Power Generation To generate isometric drawing and design of pipe support from piping general arrangement drawing. 300 Engineering hour
2001 Denka Singapore Chemical Plant To provide design, calculation and development plan for 3 nos of taper cone and partition plate. To cad assembly drawing for 3 nos of silos 250 Engineering hour
2001 TNB Janamanjung Power Plant Power Generation
To provide design for 3 
units silos and sand filter
 
1,500 engineering hour
2001 TNB Tunku Jaafar Power Station Demin Water Treatment To provide design for front piping, interconnection piping and rack design.
 
3,800 engineering hour
2001 Bang Bo / Alstom Power Plant Thailand Power Generation Appointed as pipe racking system designer to provide design calculation to BS 449 and detailed fabrication drawing for pipe rack. 2,650 engineering hour
2001 Petronas CUF-Kerteh Oil and Gas Waste Treatment Appointed as piping designer to generate piping layout dwg, isometric dwg. BQ support detail and typical drawing for hook up 4,500 engineering hour
2001 Epson Laguna Philippines Semi-con / Waste Treatment To provide engineer, design and fabrication drawing for hot water tank in accordance to API 650 (150m3) 800 engineering hour
2001 TNB Janamanjung Waste Treatment
To provide detail drawings for equipment and chemical skid
 
2,750 engineering hour
2001 TNB Janamanjung Waste Treatment
To provide detail drawing for clarifier and thickener tank.
 
1,570 engineering hour
2001 Schenker Logistic General Industries Appointed as structural designer to design dwgs for staging platform and lifting cage. Lifting capacity is 15 ton. 500 engineering hour
2000 FPG Oleochemical Kuantan Waste Treatment Appointed as Piping Designer and to provide Piping General Arrangement, Isometric Drawing and Material Take-Off. Upon completion of construction to provide as-built drawing for submission to Owner. 200 pcs of isometrics and 8 pcs of G.As.
2000 Fpg Oleochemical Kuantan Waste Treatment Appointed as Pipe Racks Designer and to provide General Arrangement, Cross Section and Shop Drawing. 45 pcs of shop drawing and 7 G.As and Section Drawing
2000 Motorola MOS 17, China Ultra Pure Water and Waste Treatment To provide Bill of Quantity and Material Take-Off from provided piping isometrics. MTO issued for procurement and material controlling. 350 pcs of isometrics and
material cost approx. RM2m
2000 Silterra Wafer Technology Malaysia, Kulim Kedah Acid Waste Treatment and Bulk Chemical Supply Appointed as Platform and Staircase Designer and provide G.A, Calculation, Section and Shop Drawing. 80 pcs of shop drawings and 30 pcs of G.As
2000 The Star Publication Air - Con To design and provide calculation with PE
endorsement for hangers and support for air-con
ducting system. 
450 Engineering Hour 
2000 IPP Hoping Taiwan Power Generation To provide As-Built Drawing for skid equipment c/w face piping from various vendor and manufacturer. Drawing for compilation of Manufacturer Data Records (MDR). 75 skid equipment
1999 Petronas CUF, Gebeng Kuantan RO Water Appointed as Piping Designer and to provide
General Arrangement, Sections, Isometric Drawing and Material Take-Off.
198 pcs of isometrics and 7 pcs of G.As
1999 Petronas CUF, Gebeng Kuantan RO Water Appointed as Pipe Rack Designer and to provide
G.As, Sections, Calculation and Material Take-Off. 
40 pcs of shop drawings and 5 pcs of G.As
1999 Petronas CUF, Gebeng Terengganu Oil and Gas To provide Piping As-Built drawing upon mechanical completion for the use of testing, commissioning and records. 634 pcs of isometrics -.
1999 Petronas CUF, Gebeng Terengganu Oil and Gas To provide Bill of Quantity and Material Take-Off from provided piping isometrics. MTO issued for procurement, cost and material controlling. 634 pcs of isometrics and material cost approx. RM4.5m
1999 Telekom Building HQKL Air-con and building services To provide design, calculation with PE endorsement, and shop drawing for up-graded
centralized air-con system.
69 pcs of shop drawings and 46 pcs of G.As 
1998 Petronas Amonia KR- 2 Kerteh Oil and Gas
To mark-up weld maps and prepare shop drawings on provided piping isometric drawings.
 
558 pcs of isometrics
1998 Petronas Amonia KR- 2 Kerteh Oil and Gas
To provide hook-up for instrumentation.

 

300 Engineering hour 
1998 Hanwa AJ General To provide design and calculation of a cutting bay
for an imported Plasma CNC Cutting Machine.
200 Engineering hour
1998 Hanwa AJ Shah Alam Genaral To provide design and calculation for a structural steel workshop cum office building for Plasma CNC Cutting Bay. (c/w with PE endorsement) 1,450 Engineering Hour 
1998 Eastman Chemical Pulau Sakra Oil and Gas To provide design and shop drawing for platforms and ladders for process equipment.
 
120 set of platform and ladders
1998 Petronas PSR 2 Melaka Oil and Gas To provide design and shop drawing for a mobile storage for Bulk Chemical.
 
250 Engineering hour
1998 Petronas PSR 2 Melaka Oil and Gas To provide design calculation and fabrication drawing for Pressure Vessel and Storage Drums. 4 unit PVs and 8 drums